The mining plan created once should undergo changes as mining progresses. The user may modify, replace or erase panel perimeters in correspondence with changes in the existing mine and then use this command to update the mine plan data. Do not modify or erase the remaining linework, since this linework and internal plan data will be updated to match changes in the associated perimeters. This command should also be used every time the panel polyline is moved, replaced or edited for any other reason.
Naturally the mine starting date should be moved forward each time plan is updated, so that timing of the remaining plan remains correct.
Original Plan
|
Highlight grips
|
Drag grips
|
Updated panel
|
Once the panel linework is updated, re-run the Underground
Timing updating the plan start.
Pulldown Menu Location: UnderGnd
Keyboard Command: update_plan