Report Tons & Acres

When you run the take-up procedures Quantities by Average, Quantities by Grid, or Quantities by Centerline, at the end of the procedure after the routine has posted the take-up report you are prompted to update the Tonnage Report. The Tonnage Report gives you the option of keeping track of tons for an Owner, Mine, and each Panel for specific periods of time.

Mine Report produces coal tonnage reports for a specified mine, panel, or ownership.
NUMERICAL AVERAGE COAL SECTION METHOD
Individual Stratas Configuration
MINE: LEAF MINED FROM — 3-1-05 TO — 4-1-05
AREA NO. 1 DESCRIPTION:
LINEAR FEET OF ADVANCE: 2005.95
AVERAGE ENTRY WIDTH: 18.20
NET AREA MINED (S.F.): 36508.30 NET ACRES MINED: 0.838
AVERAGE Coal THICKNESS (INCHES): 59.00 (FEET): 4.92
AVERAGE Hard Rock THICKNESS (INCHES): 4.00 (FEET): 0.33
TOTAL MINING HEIGHT (INCHES): 63.00 (FEET): 5.25
AVERAGE Coal WT. (LBS/CU. FT.): 77.00
AVERAGE Hard Rock WT. (LBS/CU. FT.): 104.00
Coal (TONS): 6910.72
Hard Rock (TONS): 632.81
NON-RECOVERABLE COAL (TONS): 0.00 COAL RECOVERY PERCENT: 100.00%
TOTAL TONS : 7543.53 PERCENT COAL BY WGT.: 91.61%
COAL ACRE-FEET: 4.121
CAVITY ACRE-FEET: 4.40


Reports are created for a certain time period. If no dates are entered, a report is generated that includes all the known data. Besides reporting the tons mined for the period, Mine and Panel reports also include the total reserves and remaining reserves.

Coal tonnage data is made with the Quantities by Average Method or Quantities by Grid Method commands, and the data is stored in *.MIN, *.PAN, or *.OWN files in the data directory. These files are in a straightforward ASCII format and may be edited by the Inquiry Dropdown > Display Edit File command.

Prompts

Type of report (Mine, Panel, <Owner>): Enter a name
Report Source File selection dialog The available data files are displayed for selection.
Enter a beginning date (MM-DD-YY): enter a date If no date is entered, the earliest date in the data file is used.
Enter a ending date (MM-DD-YY): enter a date If no date is entered, the latest date in the data file is used. You can also select the files from the dialog box.

Sample source mine data file

Sample Mine Report

Sample Owner Report
Sample Panel Report

Output report to printer (Y/(<N>): enter Y or N
Besides outputting to the screen, the output can be sent to a printer in the PRN slot.
Do another report (Y/<N>): enter Y or N

Pulldown Menu Location: Works
Keyboard Command: mreport
Prerequisite: Quantity report files