Design Valley Pond

This feature will design a valley pond, essentially by creating a dam across a low area, beginning with a surface model file (.GRD, .TIN, .FLT), or screen entities representing the surface, and a 2D polyline that defines the top of dam. These components must be present before starting.  If Screen Entities are used, the program internally creates a grid mesh from the surface entities (Contours, Tri-Mesh, 3D polys) found by doing a crossing selection of the grid limit.

The design is drawn as 3D polylines with an option to drawn contours on the pond, and the earthwork volumes and stage-storage volumes are calculated.

The Cut Pond Interior option has two methods for cutting volume from the pond interior. This cut will create more water storage. The trace method prompts you to define a 3D polyline by picking points starting at the dam and going around the pond counterclockwise. At each point you enter an elevation. The default is the current ground elevation and typically you would enter a lower elevation. Then you enter a cut slope and the program will cut from this perimeter polyline at the entered slope. The polyline method requires a pre-drawn closed polyline inside the pond. The program will ask for a depth to cut and a cut slope. Polyline is set to the current ground elevation minus the cut depth. Then the program cuts out from the polyline to the original ground at the cut slope.

Prompts

For Screen Entities method:
Pick Lower Left limit of pond disturbed area: pick lower left
Pick Upper Right limit of pond disturbed area: pick upper right Be sure to pick these limits well beyond the area of the top of dam polyline in order to make room for the outslopes.
Make 3D Grid File Dialog
After selecting the limits of the disturbed area the program will generate a 3D grid that represents the surface. Specify the grid resolution desired and select OK.

Pick the top of dam polyline: select a 2D polyline
Pick a point within the pond: pick a point
Enter the fill outslope ratio <2.0>: 2.5 Enter
Enter the cut outslope ratio <2.0>: 2.5 Enter
Enter the top of dam elevation: 90 Enter

TOP OF DAM POLYLINE
Existing contours with top of dam polyline
Valley Pond showing Emergency Spillway

Choose method to specify storage elevations (<Automatic>/Manual)? Enter If manual is selected the user can specify the elevation(s) to calculate.
Adjust parameters and redesign pond (Yes/<No>)? Enter If yes, the user will be able to enter new slope ratios and dam widths etc...


Valley Pond Design complete with contours

3D view of Valley Pond

Pulldown Menu Location: Surface > Design Pond in Civil, Structure in Hydro
Keyboard Command: vpond